This chapter will introduce how to open, save projects, and some related settings, allowing users to quickly understand how to use them

6-1 Create Project

6-1-1 Create a New Project

To create a new project for editing controller programs. First, use the mouse to click on 〔File〕 at the top left corner of UperIO. →〔Open New Project〕

Chapter 6 Project Management - 1

Chapter 6 Project Management - 2

▲Open New Project

After clicking〔Create a New Project〕, the following window appear. Set the project name and the model of the coupler, then click〔OK〕 to open the new project.

Chapter 6 Project Management - 3

▲Create New Project

Function

Explanation

Project Name

Please define a name for this project for easier management the file in the future.

Series

According to corresponding series from the drop-down menu and choose the one based on the actual series used.

Model

Based on the drop-down menu, select the corresponding model based on the actual machine type used. The program will automatically display the specifications and descriptions of this model below.

▲Settings for Creating a New Project

6-1-2 Project Editing

Click on〔Hardware Configuration〕to enter editing mode. In the toolbox on the right, you can select modules and drag them onto the main module of the coupler. During the dragging process, the expected position for configuration will appear in yellow, as shown in the figure below. When dragging a module behind the current module, it will automatically be placed at the end of the module. Double-clicking a module in the toolbox will also automatically add the module to the end of the currently configured modules.

▲Project Editing

Chapter 6 Project Management - 4

Users can also drag and adjust the position of newly added modules themselves to accommodate the actual configuration of the coupler.

6-1-3 Project Download

This feature allows users to download the Coupler project planned with UperIO to the Coupler for execution.

※Notice: The project download function can only be executed when the software is offline.

6-1-4 Download Parameter Settings

Clicking on “Download Parameter” will show the user with options for Ethernet and USB connection methods.

Chapter 6 Project Management - 5

▲Download Parameter Settings

Function

Explanation

Network Connection

Select the desired network interface card.

Chapter 6 Project Management - 6

Information of Network Connection

Display current network interface card information.

Type

Network Communication Protocol

IP Address

Coupler IP

Search

Search for the network address of the existing Coupler on the network.

Port

Coupler port

▲Explanation of Download Parameter Setting

Users can adjust the connection parameters themselves on the advanced settings page.

Chapter 6 Project Management - 7

▲Advanced Settings for Download Parameters

Clicking on USB will display the currently connected Couplers via USB for the user to select.

Chapter 6 Project Management - 8

▲USB Project Download Settings

Click on “Connection Test” in the bottom left corner allows you to perform a connection test to confirm if the connection is normal.

6-1-5 Download Project

Click on Download to compare the current open project with the project in the coupler.

Chapter 6 Project Management - 9

▲Download Project

When the file is matching, it will show[The current project is same as the device.]

Chapter 6 Project Management - 10

▲Matching Prompt

When the file is not matching, it will show the comparison window. Allow user to select which project to download.

Chapter 6 Project Management - 11

▲Coupler is Not Matching with Project

After clicking “Download,” the download process will begin and continue until the progress window is completed.

Chapter 6 Project Management - 12

▲Download Completed

6-1-6 Open Old Project

Click〔File〕 in the top left corner→〔Open Project〕, you can open previously edited projects。

Chapter 6 Project Management - 13

6-1-7 Save Project

Click〔File〕 in the top left corner→〔Save Project〕, you can use this function to save the edited project to the disk.

Chapter 6 Project Management - 14

6-1-8 Save As Project

Click〔File〕 in the top left corner→〔Save as project〕when the opened project has been edited, you can save the edited project as another project name to the disk.

Chapter 6 Project Management - 15

6-1-9 Close Project

Click〔File〕 in the top left corner→〔Close Project〕, the project will be closed.

Chapter 6 Project Management - 16

6-1-10 Quit

Click〔File〕 in the top left corner→〔Quit〕,close UperlO software.

Chapter 6 Project Management - 17

6-2 View

This section will introduce the method of quickly and easily configuring the IO Coupler application with the same configuration using images, and setting the corresponding information. Detailed explanations are provided in the following sections.

6-2-1 Examples of Module Configuration

Display

Chapter 6 Project Management - 18

▲Module Display

Chapter 6 Project Management - 19

▲Function Bar_View

Function

Description

Auto Fit

Automatically scale the module to the appropriate position.

Decive Dimension

The dimensions of the device will be indicated.

Select Info

Information about the selected device, such as ID, firmware version, hardware version, serial number, and description, will be displayed.

Device Monitor

The status of the selected module will be shown on the right side.

Power Consumption

Calculate the current power consumption of all extension components.

Mapping Table

Query the current IO mapping to Modbus TCP and Ethernet/IP locations.

▲Function Bar_View Description

6-2-2 Decice Dimension

Click on the function bar [View] → [Device Dimension], and the dimensions of each module will be displayed on the screen, as shown in the figure below:

Chapter 6 Project Management - 20

▲Device Dimension

6-2-3 Module Information

Click on the function bar [View] → [Select Info], then left-click on the module you want to view, and the information of the selected module, such as version number, terminal point count, remarks, etc., will be displayed, as shown in the figure below:

Chapter 6 Project Management - 21

▲Module Info

6-2-4 Device Monitor

Click on the function bar [View] → [Device Monitor], and the device monitoring window will appear on the right side:

Chapter 6 Project Management - 22

▲Device Monitor

In the information section, you can select the resources you want to display, such as [Digital Data], [Logic Data], [Status Data].

a. Digital Data

Click [Digital Data D] in the information section above [Device Monitor], and only digital data will be displayed in the module list. When you hover the mouse over the value, if the switch appears blue as shown in the figure below, you can directly modify the switch of that register.

Chapter 6 Project Management - 23

▲Digital Data in Device Monitor

b. Logic Data

Click [Logic Data A] in the information section above [Device Monitor], and only logical data will be displayed in the module list. When you hover the mouse over the value, if the data appears blue as shown in the figure below, you can modify the value of that register. You can also quickly change the value display format using [Dec] and [Hex] on the right side of the register.

Chapter 6 Project Management - 24

▲Logic Data in Device Monitor

c. Status Data

Click [Status Data S] in the information section above [Device Monitor], and only status data will be displayed in the module list. When the data appears gray as shown in the figure below, the value of that register cannot be modified. However, you can still quickly change the value display format using [Dec] and [Hex] on the right side of the register.

Chapter 6 Project Management - 25

▲Status Data in Device Monitor

6-2-5 Power Consumption

Click on the function bar [View] → [Power Consumption], and a power consumption calculation window will appear in the lower right corner, as shown in the figure below:

Chapter 6 Project Management - 26

▲Power Consumption

Function

Description

Module

Select the currently used power module.

Power Supply

The amount of electricity provided by this power module.

Usage

Display the total electricity consumption of all current modules.

External

Display the total electricity expected to be provided by external power sources.

Power Remain

The remaining electricity after deducting the supplied electricity from the power module.

▲Power Consumption Description

Some modules, like the M04DA shown in the diagram, require additional power supply. Users can decide whether to power them from the host or use an external power source.

If you choose to use an external power supply, clicking on will set the power source to external and recalculate the current power requirement. This is shown in the figure below:

Chapter 6 Project Management - 27

Chapter 6 Project Management - 28

▲External Power Supply

6-2-6 Module Settings

Double-clicking on the expansion component with the left mouse button will bring up the corresponding module’s settings window.

Chapter 6 Project Management - 29

▲Module Settings

While each module’s equipment information may differ slightly in terms of names and descriptions, the displayed information is the same. The following diagram uses M04AD as an example to introduce the relevant content of equipment information.

Chapter 6 Project Management - 30

▲Device Info(M04AD)

Information

Description

Model Name

The name of this module, which is a factory setting and cannot be edited.

ID

Automatically displays the current number of this module based on the device’s overall sorting.

Description

The functional description of this module, which is a factory setting and cannot be edited.

Frimware Version

You can click the upgrade button on the right to upgrade the firmware of all existing modules in the IO Coupler. This function can only be used in [Management].

Chapter 6 Project Management - 31

Hardware Version

The current hardware version of this module, which is a factory setting and cannot be edited.

Serial Number

The current serial number of this module, which is a factory setting and cannot be edited.

▲Device Info

The configuration settings for each module will display the corresponding parameter content. The following will mainly use M04AD as an example to explain how to operate the configuration settings.

Users can enable or disable the corresponding channels and modify detailed parameters. For detailed parameter definitions, please refer to the relevant manual.

Chapter 6 Project Management - 32

▲Configuration (M04AD)

When in the [Management], the AI and AO modules have calibration functions. The following will use M04AD as an example to introduce this process.

Chapter 6 Project Management - 33

▲Module Calibration management (M04AD)

Clicking on the [Calibration] option in the [Configuration Settings] section at the bottom will open the calibration window for the corresponding module. First, select the channel you want to calibrate on the left side, then choose the desired settings in the calibration settings, and follow the corresponding steps to complete the calibration.

At the bottom left of the module, there are options for export and import, allowing users to quickly export and import pre-configured settings.

Chapter 6 Project Management - 34

▲Module Settings Export and Import

Copy and Paste

In the configuration settings, right-clicking on the [Channel] allows you to perform functions such as copy, paste, and restore.

Chapter 6 Project Management - 35

▲Right-click functions for channels

Function

Description

Reset to Default

Restore all current settings of the channel to the initial default values.

Copy

Copy all settings of the currently selected channel.

Paste

Paste the previously copied channel settings.

▲Right-click function description